| Home | Back | Chinese |

Leng Jiapu Project

LENG JIAPU CONTRACT

This is the second production sharing contract entered with CNPC in 1998. Similar to the first contract, the contract zone has proved oil reserve, of which the company starts to share the production immediately after the commencement of the contract. Additionally, the contract zone is a new production area with potential to confirm new STOIIP. Followings are the key data of the contract, if you need details of the contract, please refer to the circular.

 

 

 

Location
Acquisition cost (million Renminbi)

Sharing %

¡@¡@
Liaohe, Liaoning province

1,008

70

 

Commencement date

Contract period

Contract Area (Sq.Km)

¡@¡@

1/3/1998

20 years

270.8

Proved STOIIP (MM tonnes)
Recovery factor
Estimated remaining recoverable reserve (31/12/98)
API
138.23

16.3 % (average)

16.80 (11.76)

11-20 (heavy)

22-32 (light)

 

YEAR (Month)
Sales volume

(MM tonnes)

Newly confirmed increase of STOIIP (MM tonnes)
Conversion

(Bbl : Tonnes)

1998 ( 3 - 12)
978,378 (684,865)

14.74 (10.32)

6.5718

Figures in bracket represent the company's share.

| Home | About CNPCHK | Our Business | News Library |Investor Information | Contact infomation | Site Map |

Copyright © 1999 by CNPC ( Hong Kong ) Limited, All rights reserved